SUPPLY AND INSTALLATION OF 10 HA DRIP IRRIGATION SYSTEM FOR MANGO AND 2 HA FOR SWEET CHILLI
Lilongwe
2025
Project Description
Works Executed / Scope
• Drilling of one borehole
• Construction of a tank stand to hold two 10,000-litre tanks
• Installation of solar water pumps
• Installation of a water supply system