INSTALLATION OF SOLAR-POWERED IRRIGATION SYSTEM AND DRILLING OF BOREHOLES – MW-ASWAP II-289135-SPI-LL
Lilongwe
2023
Project Description
Works Executed / Scope
• Drilling of two high-yield boreholes
• Construction of a tank stand to hold three 10,000-litre tanks
• Installation of solar pumps
• Installation of a 6-hectare drip irrigation system